46. The daily report under section 45 shall contain all the information collected concerning operations carried out while drilling the well, in particular:(1) spudding date and date of the end of drilling;
(2) the name of the drilling contractor;
(3) depths reached at the beginning and end of each shift;
(4) the time spent by the drilling crew on different operations related to drilling operations;
(5) the type, dimensions and weight of the casing and its setting depth;
(6) the quantity and rate of drilling mud lost in the well;
(7) a summary of the working condition of the blowout prevention equipment;
(8) the type of pump used and its capacity;
(9) properties and volumes of mud used;
(10) components used to assemble the drill strings;
(11) the weight applied to the bit and its speed of rotation;
(12) results of all deviation and directional surveys;
(13) the type of cement used for cementation of each casing, giving its density, the nature of its additive and the quantity used;
(14) mention of any trace of gas, oil or water in the well;
(15) results of pressure tests;
(16) the reasons for the loss of any casing or other equipment in the well together with a description of fishing operations;
(17) a description of the well closing procedure used, where drilling is stopped temporarily or permanently;
(18) the following information concerning the conditions of the drilling unit operations, where drilling is in a water-covered area:(a) name of the drilling unit;
(b) number of persons aboard;
(c) variations in temperature during the day;
(d) wind velocity and direction;
(e) height, interval and direction of wavers and swell;
(f) visibility in kilometres;
(g) the roll, pitch and vertical movement in the case of an offshore drilling unit;
(h) dimensions, distance and direction of any icebergs.